drainage study

Drainage study software · TR-55 on live data

Get a drainage study for any project.

Parcels, roads and culverts, detention ponds: draw the area and get peak flows, pond sizing and a report you can put your stamp on. The answer takes about a minute, and every number behind it stays visible.

Your first study is free. No card to start.

Catchment A — 2.4 ac
4.82
cfs peak flow, 10-yr storm

Your 12-inch pipe handles it, with 31% capacity to spare.

  1. 01

    Pick the point

    A culvert, a crossing, an outfall or a parcel. The pour-point snap changes with the kind of point you picked — a road crossing pulls onto the stream, a parcel barely moves. Or draw the area by hand.

  2. 02

    Delineate the watershed

    USGS 3DEP terrain, priority-flood fill, D8 accumulation, and the contributing area traced upstream. The window grows until the watershed fits, or it tells you it was truncated.

  3. 03

    Run it

    NOAA Atlas 14 depths and SSURGO soils fetched live for that catchment. Composite CN, time of concentration measured off the longest flow path, TR-55 hydrographs routed by modified Puls.

  4. 04

    Read the answer

    Peak flow and volume, what it means in one sentence, and a detention pond sized and sited if the site owes one. Every intermediate value stays on screen.

A road alignment drawn across a watershed, with each crossing located on the map
A road alignment, and every crossing it makes with the watershed above it.
A detention pond sited on the terrain inside the delineated watershed
The detention pond the site owes, sized across every storm and placed on the ground.
Pre- and post-development peak flows for a parcel, with the watershed outlined
Pre and post peak flows for a parcel program, with the criteria that apply.
First page of the generated drainage study report
The report, in PDF and Word, ready for your stamp.

The watershed

Delineated from USGS 3DEP terrain and snapped to the pour point for the kind of point you picked. Large watersheds split into sub-basins at their stream junctions.

Rainfall and soils

NOAA Atlas 14 depths and SSURGO hydrologic soil groups, fetched live for that catchment — not typed in from a table.

Road crossings and culverts

Every place a road alignment crosses flowing water, with the culvert sized by FHWA HDS-5 and the headwater checked.

Flow and storage

TR-55 runoff and hydrographs, routed by modified Puls, with a detention pond sized across every storm and placed on the terrain.

Floodplain

FIRM panels and effective dates, SFHA and floodway intersections, and the explicit CLOMR, LOMR and no-rise language the review will ask for.

Criteria and the report

The jurisdiction's criteria applied and each finding stated, then a preliminary drainage study report in PDF and Word.

Every number traceable to a published method.

Drainage Study does not invent hydrology. It runs the methods your reviewer already accepts, on data it fetches for your site, and it shows the substituted values behind each result — not just the answer.

It is preliminary and honest by design: every output is labeled, every gap is stated, and nothing is sealed. This is the work that happens before the seal, so the expensive surprises surface while the design can still move.

  • NRCS TR-55Runoff curve number, time of concentration, tabular hydrograph
  • NEH-630Dimensionless unit hydrograph and convolution
  • NOAA Atlas 14Point precipitation frequency by coordinate
  • USDA SSURGOHydrologic soil groups for the catchment
  • USGS 3DEP1 m elevation where it exists, 10 m everywhere else
  • FHWA HDS-5Inlet-control culvert sizing and headwater checks
  • FEMA NFHLEffective floodplain, floodway and panel data

Civil engineers

You already know how to do this study. The hours go into delineating the area, chasing rainfall and soils data, and rebuilding the same spreadsheet. Drainage Study does that part in about a minute and hands you every intermediate value, so the judgment stays yours and the clerical work stops being yours.

Developers and land buyers

Before you close on a parcel, you want to know what the drainage will cost you — how much detention the site owes, and how much of the ground you are buying is still developable after it. That answer usually takes a consultant and a week. Here it takes a point and a minute.

Your first study is free.

Create an account, pick a point, and read the answer. A subscription takes over after the first study.